The Minister of Works, David Umahi, has reiterated that the reconstruction of the East-West Road will proceed as an additional federal infrastructure project and will not replace or disrupt the 750-kilometre Lagos-Calabar Coastal Highway, following controversy over his earlier comments about the coastal project’s route, ValidViewNetwork reports.
Umahi restated the Federal Government’s position on Sunday, November 22, during an inspection of bridge construction on Sections 1 and 2 of the coastal highway.
In a statement issued in Abuja on Monday by his Senior Special Assistant on Media, Francis Nwaze, the minister said President Bola Tinubu remained committed to completing the coastal highway across the nine states along the corridor.
“Nothing will happen to the 750-kilometre Lagos-Calabar Coastal Highway, which passes through the nine coastal states. The President has directed that the project must be completed as envisaged,” Umahi was quoted as saying.
The minister specifically clarified that the reconstruction of the East-West Road was an additional commitment by the President and would neither replace nor affect the coastal highway.
HOW THE ROUTE CONTROVERSY STARTED
The latest clarification follows remarks Umahi made on October 12, when he said Tinubu had directed that the Lagos-Calabar Coastal Highway be diverted through the existing East-West Road from Ondo State into Edo State.
At the time, the minister explained that the proposed change was intended to avoid constructing a new alignment along the corridor, citing concerns about flooding and the condition of parts of the existing East-West Road.
His comments generated questions about whether the Federal Government intended to abandon or alter sections of the original coastal highway alignment.
The minister subsequently dismissed reports that the project had been abandoned. He said the government had approved the reconstruction of an additional 400 kilometres of the East-West Road from Edo State towards Akwa Ibom and Cross River states.
During an interview with ARISE News on October 23, Umahi further clarified that the coastal highway would retain its original alignment, while a spur would connect it to the East-West Road to provide motorists with an alternative route.
He described his earlier use of the word “divert” as a slip of the tongue, explaining that the intended arrangement was a connection rather than a replacement of the coastal highway.
GOVERNMENT SAYS BOTH PROJECTS WILL CONTINUE
During the latest inspection, Umahi again maintained that both road projects would proceed independently.
According to the statement, he described the 750-kilometre coastal highway as a major national investment expected to attract private-sector participation, support tourism and industrial activities, and generate economic opportunities along the coastal corridor.
He said the project would incorporate concrete pavement and solar-powered infrastructure, which he argued could also create opportunities for carbon-credit benefits.
The minister added that the highway would accommodate tourism facilities, factories, CCTV surveillance systems and other commercial infrastructure.
He also disclosed that President Tinubu was expected to commission Section One of the project later in November or early December 2026.
The minister further identified the 1,068-kilometre Sokoto-Badagry Road as another major infrastructure project being pursued by the administration.
THREE-WEEK EMERGENCY ROAD REHABILITATION
Beyond the coastal highway, Umahi said he had directed a three-week nationwide emergency rehabilitation of major federal roads ahead of the festive season and the January 2027 elections.
Do you want to advertise with us?
Do you need publicity for a product, service, or event?
Contact us on WhatsApp +2348033617468, +234 816 612 1513, +234 703 010 7174
or Email: validviewnetwork@gmail.com
CLICK TO JOIN OUR WHATSAPP GROUP
He instructed zonal directors, controllers, resident engineers and contractors to return to their respective sites and ensure that failed sections of federal highways were made motorable within the stipulated period.
The directive, according to the minister’s statement, is intended to ease the movement of people and goods, support the transportation of election materials and strengthen security operations ahead of the elections.
Umahi warned contractors against concentrating solely on permanent construction work while leaving other sections of roads impassable to motorists.
He directed that damaged sections be excavated and repaired with appropriate materials and asphalt where necessary.
The latest assurance does not erase the earlier uncertainty generated by the minister’s October remarks.
Rather, it restates the government’s current position that the coastal highway’s original route remains intact and that the East-West Road reconstruction is a separate, complementary undertaking.
ValidViewNetwork reports that the Federal Government maintains that both projects will proceed, while the implementation of the announced alignments and construction plans remains a matter for continued public scrutiny.